Back to Results
Photograph

View south on Alki Avenue during regrade, showing rail tracks and homes, West Seattle, August 19, 1913

Order an Image
In the winter of 1913, the Seattle-based hydraulic contracting firm Lewis, Wiley & Morse began work on a regrade, fill and seawall project along Alki Avenue in West Seattle. The construction continued through 1913 and was completed in the spring of 1914. The project involved a hydraulic hillside regrade near the intersection of Fairmount Avenue and Alki Avenue. A new seawall was constructed along Elliott Bay and a municipal water system pipeline installed along Alki Avenue. The existing wood plank roadbed was also widened during the 1913-1914 projects. Alki Avenue was eventually paved in 1923.

In this photo, a horse-drawn carriage travels north on the plank road alongside rail tracks on Alki Avenue. A grocery store is visible at left.

Caption on photo: Lewis. Wiley & Morse, Inc. Alki Ave. regrade.Looking So. along Alki Ave. from N. side of Hines St. Aug. 19th `9`3. #62.
Photographer's number: 27881.
ID Number: 2010.3.32.61
Date: 1913
Creator(s): Curtis & Miller, Photographer
Physical Description: 1 photographic print : b&w ; 7.5 x 9.5 in.
Additional Information: Digital copy of this item available thanks to funding from a 2016 Institute for Museum and Library Services grant. Metadata updated as part of a grant from the Institute of Museum and Library Services administered by the Library Services and Technology Act, through the Washington State Library, a division of the Office of the Secretary of State.
View the finding aid for this collection at https://archiveswest.orbiscascade.org/ark:80444/xv70913
Credit: MOHAI, Lewis, Wiley and Morse Inc. Alki Avenue Regrade Photograph Album, 2010.3.32.61
Copyright: No Known Copyright