Back to Results
Photograph

Excavation for Metro bus tunnel at 6th and Pine, Seattle, January 4, 1988

Order an Image
The Downtown Seattle Transit Tunnel (Metro Bus Tunnel) is a 1.3-mile-long public transit tunnel that runs underneath downtown Seattle. Constructed between 1987-1990, the $455 million tunnel originally built for buses was updated in 2009 to include light rail access.

In this image, Pine Street at Sixth Avenue is shown being excavated once again for tunnel construction after it had been temporarily reopened to traffic for the holiday season following excavation the previous year.

Caption information derived from captions written by Post-Intelligencer staff and attached to the back of the photograph.
ID Number: 2000.107.124.37.05
Date: 1988
Creator(s): Bainter, Mike, Photographer
Physical Description: 1 photographic print : b&w ; 8 x 10 in.
Additional Information: Digital copy of this item available thanks to funding from a 2016 Institute for Museum and Library Services grant.
Credit: MOHAI, Seattle Post-Intelligencer Collection, 2000.107.124.37.05, photo by Mike Bainter
Copyright: All Rights Reserved